Home
What is this? Why Van's? Why the -9A?
Empennage HS VS Rudder Right Elevator Left Elevator
Wings Setup Delivery/Inventory Spar Prep Ribs Assembly Tanks More Tanks Tanks Alot Final Assembly Finishing Ailerons Flaps
Fuselage Delivery/Inventory Firewall F-704 Bulkhead F-705 Bulkhead Bulkheads Tailcone Center Section Forward Section Forward Assembly Top Skins Cabin Stuff More Cabin Stuff
Finishing Delivery/Inventory Cabin Plumbing Panel Install Firewall Stuff Misc. Cabin Stuff Slider Frame Electrical Part 1 Electrical Part 2 Electrical Part 3 Empennage Emp. & Gear Avionics 1 Avionics 2 Canopy Misc. More Misc. Finishing Up
Firewall Forward Engine Stuff 1 Engine Stuff 2
Final Steps Moving to the Airport Attaching the Wings Misc.
Flying First Flight First 10 Hours Gear Fairings Test Flying Painting Sun-N-Fun 2006 Spring 2006 Christmas 2006
Misc. Panel Planning Panel Layout Lights Misc. Notes Tools Glossary Links
Thanks to Smitty for this picture of us landing at TKI.
Check out my RV-10 construction site.
Watch the First Flight Video (11meg QuickTime)
Watch the First Taxi Video (12meg QuickTime)
Watch The Engine Start Video (22meg QuickTime)
Current Status: Empennage Complete: 172 hours Wings Complete: 351 hours Fuselage Complete: 375 hours Finishing Kit: 560 hours Firewall Forward: 50 hours Final Steps: 67 hours Flying: 200+ hours
Last Updated: 8/26/09
Questions or comments? Email Me
GPS Panel Dock
EIS Editor
Sun N Fun 2006
Texas RV Fly-In 2005
Sun N Fun 2005
Engine Overhaul (updated)
Instrument Panel
First flight: plans-built Sonex
My Trip to Oshkosh 2004
See Pictures from the EAA Southwest Regional Fly-In 2004